1. Signallilng portion of work in connection with TTR, TSR- 84 sets, TTR, TWS- 84 sets, CMSC- 3 sets, SEJ- 10 sets & Glued Joints- 47 Nos between Maligura- Kirandul of WAT Divn. 2. Signalling portion of work in connection with TRR, P- 1. 520 km from Km. 341. 650 to Km. 350. 010 DN Line in patches in K. K. Line of WAT Divn. 3. Signalling portion of work in connection with TRR, P- 1. 530 km from Km. 365. 170 to Km. 369. 500 DN Line in patches in K. K. Line of WAT Divn. 4. Signalling portion of work in connection with TRR, P- 1. 500 km from Km. 358. 160 to Km. 359. 660 DN Line in patches in K. K. Line of WAT Divn. 5. Signalling portion of work in connection with CTR, P- 1. 360 Tkm between Malligura- Kirandul, SL., All the works are over SSE/ SIG/ JDB and SSE/ SIG KRPU sections of Waltair Division