1. Signallilng portion of work in connection with TTR, TSR- 84 sets, TTR, TWS- 84 sets, CMSC- 3 sets, SEJ- 10 sets & amp Glued Joints- 47 Nos between Maligura- Kirandul of WAT Divn. 2. Signalling portion of work in connection with TRR, P- 1. 520 km from Km. 341. 650 to Km. 350. 010 DN Line in patches in K. K. Line of WAT Divn. 3. Signalling portion of work in connection with TRR, P- 1. 530 km from Km. 365. 170 to Km. 369. 500 DN Line in patches in K. K. Line of WAT Divn. 4. Signalling portion of work
Kirandul, Chhattisgarh, India
Important Dates
Bid submission started
April 23, 2024, 11:17 p.m.
Bid submission ended
May 15, 2024, 8:30 p.m.
Price Information
Price
39.23 Lacs
EMD
78.5 Thousands
Tender Description:
1. signallilng portion of work in connection with ttr(tsr)-84 sets, ttr(tws)-84 sets, ttr(cmsc)-3 sets, sej-10 sets & glued joints - 47 nos between maligura - kirandul of wat divn. 2. signalling portion of work in connection with trr(p) - 1.520 km from km.341.650 to km.350.010 dn line in patches in k.k.line of wat divn. 3. signalling portion of work in connection with trr(p) - 1.530 km from km.365.170 to km.369.500 dn line in patches in k.k.line of wat divn. 4. signalling portion of work in connection with trr(p) - 1.500 km from km.358.160 to km.359.660 dn line in patches in k.k.line of wat divn. 5. signalling portion of work in connection with ctr(p) - 1.360 tkm between malligura -kirandul (sl). (all the works are over sse/sig/jdb and sse/sig krpu sections of waltair division) bidding type normal tender
Tender Type:
open
Dates:
Published on
April 23, 2024, 11:17 p.m.
Bid Opening Date
May 15, 2024, 8:30 p.m.
Doc Download started
April 23, 2024, 11:17 p.m.
Doc Download ended
May 15, 2024, 8:30 p.m.
Documents
Sign up to access Documents
START A FREE 7-DAY TRIAL
Department & Other Tender Information
Sign up to access Tender Information
START A FREE 7-DAY TRIAL
Similar Tenders
ANDHRA PRADESH
Signalling portion of work in connection with 1. TTR ( TWS + WCMS )- 66 sets. TTR ( TSR )- 39 sets, SEJ- 04 sets & Glued Joints- 73 Nos between Koraput- Singapur Road- Vizianagaram. 2. CTR ( S )- 11. 161 Tkm between Singapur Road- Vizianagaram ( Loop Lines ). 3. TRR ( P )- 4. 319 Tkm between Singapur Road- Vizianagaram Jn. ( DN ). 4. CTR ( P )- 1. 723 Tkm between Singapur Road- Vizianagaram ( UP & DN ). 5. TRR ( P )- 1. 515 km between RUL- LLGM Stations on K. R. Line of WAT Divn. 6. TRR ( P )- 1. 396 km between BGUA- LKMR Stns on K. R. Line of WAT Divn. 7. TRR ( P )- 1. 350 km between PVP- SNM Stations on R. V DN Line of WAT Divn. 8. TRR ( P )- 5. 107 Km between Kottavalasa- Malligura ( DN ). 9. TRR ( P )- 4. 180 Tkm between Vizianagaram- Visakhapatnam- Duvvada ( DN ). 10. TRR ( P )- 4. 180 Tkm between Vizianagaram- Visakhapatnam ( UP ). 11. TRR ( P )- 11. 001 Tkm between Vizianagaram- Visakhapatnam ( IV th Line & SCD Line ). 12. TTR ( CS + CMSC )- 102 sets, TTR ( CMSC )- 9 sets & SEJ- 6 sets between Vizianagaram- Visakhapatnam- Duvvada of WAT Divn. 13. TRR ( P )- 1. 400 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 14. TRR ( P )- 1. 500 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 15. TRR ( P )- 1. 502 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 16. TRR ( P )- 1. 422 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 17. TRR ( P )- 8. 265 Tkm between Kottavalasa- Koraput ( SL ). 18. Rebuilding and extension of Br. No. 1602 1607 and 1636A UP, Mid and Dn lines for realignment of curves between KTV- PDT for raising of speed 130 Kmph. ( All the works are over SSE/ SIG/ RGDA, SSE/ SIG/ VZM, SSE/ SIG/ MYD and SSE/ SIG/ SUP sections of Waltair Division )
Expires on 16th May, 2024
₹ 5986 Lacs