1. Signalling work in connection with TSR, P 62. 700 TKm M/ L 10. 130 TKm and suburban 52. 57 TKm. in CCG- VR section of Mumbai division, western Railway., 2. Signalling work in connection with CTR, S/ P 11. 224TKm and TRR, S 5. 020TKm in CCG- VR section of Mumbai division, Western Railway., 3. Signalling work in connection with Churchgate- Virar- TRR, P 0. 392 Kms on Br. No. 75 on DN TH line of Mumbai division, 4. Signalling work in connection with Churchgate- Virar- TRR, P 1. 438 Kms on Br. No. 73 on DN TH line. of Mumbai division