Signalling portion of work in connection with 1. TTR ( TWSWCMS )- 66 sets. TTR ( TSR )- 39 sets, SEJ- 04 sets & amp Glued Joints- 73 Nos between Koraput- Singapur Road- Vizianagaram. 2. CTR ( S )- 11. 161 Tkm between Singapur Road- Vizianagaram ( Loop Lines ). 3. TRR ( P )- 4. 319 Tkm between Singapur Road- Vizianagaram Jn. ( DN ). 4. CTR ( P )- 1. 723 Tkm between Singapur Road- Vizianagaram ( UP & amp DN ). 5. TRR ( P )- 1. 515 km between RUL- LLGM Stations on K. R. Line of WAT Divn. 6. TRR ( P )- 1. 396 km between BGUA- L
Vizianagaram, Andhra Pradesh, India
Important Dates
Bid submission started
April 25, 2024, 12:18 a.m.
Bid submission ended
May 16, 2024, 8:30 p.m.
Price Information
Price
59.87 Lacs
EMD
1.2 Lacs
Tender Description:
signalling portion of work in connection with 1.ttr(tws+wcms)-66 sets. ttr(tsr)-39 sets, sej-04 sets & glued joints-73 nos between koraput - singapur road - vizianagaram. 2.ctr(s) - 11.161 tkm between singapur road - vizianagaram (loop lines). 3.trr(p) - 4.319 tkm between singapur road - vizianagaram jn. (dn). 4.ctr(p) - 1.723 tkm between singapur road - vizianagaram (up & dn). 5.trr(p) - 1.515 km between rul - llgm stations on k.r.line of wat divn. 6.trr(p) - 1.396 km between bgua - lkmr stns on k.r.line of wat divn. 7.trr(p) - 1.350 km between pvp - snm stations on r.v dn line of wat divn. 8.trr(p) - 5.107 km between kottavalasa - malligura (dn). 9.trr(p) - 4.180 tkm between vizianagaram - visakhapatnam - duvvada (dn). 10.trr(p) - 4.180 tkm between vizianagaram - visakhapatnam (up). 11.trr(p) - 11.001 tkm between vizianagaram - visakhapatnam (iv th line & scd line). 12.ttr(cs+cmsc)-102 sets, ttr(cmsc)-9 sets & sej-6 sets between vizianagaram-visakhapatnam-duvvada of wat divn. 13.trr(p) - 1.400 km on sl line in patches between slpm - cmdp stations on k.k.line of wat divn. 14.trr(p) - 1.500 km on sl line in patches between slpm - cmdp stations on k.k.line of wat divn. 15.trr(p) - 1.502 km on sl line in patches between slpm - cmdp stations on k.k.line of wat divn. 16.trr(p) - 1.422 km on sl line in patches between slpm - cmdp stations on k.k.line of wat divn. 17.trr(p) - 8.265 tkm between kottavalasa - koraput (sl). 18.rebuilding and extension of br. no. 1602 1607 and 1636a up , mid and dn lines for realignment of curves between ktv -pdt for raising of speed 130 kmph. (all the works are over sse/sig/rgda, sse/sig/vzm, sse/sig/myd and sse/sig/sup sections of waltair division) bidding type normal tender
Tender Type:
open
Dates:
Published on
April 25, 2024, 12:18 a.m.
Bid Opening Date
May 16, 2024, 8:30 p.m.
Doc Download started
April 25, 2024, 12:18 a.m.
Doc Download ended
May 16, 2024, 8:30 p.m.
Documents
Sign up to access Documents
START A FREE 7-DAY TRIAL
Department & Other Tender Information
Sign up to access Tender Information
START A FREE 7-DAY TRIAL
Similar Tenders
ANDHRA PRADESH
Signalling portion of work in connection with 1. TTR ( TWS + WCMS )- 66 sets. TTR ( TSR )- 39 sets, SEJ- 04 sets & Glued Joints- 73 Nos between Koraput- Singapur Road- Vizianagaram. 2. CTR ( S )- 11. 161 Tkm between Singapur Road- Vizianagaram ( Loop Lines ). 3. TRR ( P )- 4. 319 Tkm between Singapur Road- Vizianagaram Jn. ( DN ). 4. CTR ( P )- 1. 723 Tkm between Singapur Road- Vizianagaram ( UP & DN ). 5. TRR ( P )- 1. 515 km between RUL- LLGM Stations on K. R. Line of WAT Divn. 6. TRR ( P )- 1. 396 km between BGUA- LKMR Stns on K. R. Line of WAT Divn. 7. TRR ( P )- 1. 350 km between PVP- SNM Stations on R. V DN Line of WAT Divn. 8. TRR ( P )- 5. 107 Km between Kottavalasa- Malligura ( DN ). 9. TRR ( P )- 4. 180 Tkm between Vizianagaram- Visakhapatnam- Duvvada ( DN ). 10. TRR ( P )- 4. 180 Tkm between Vizianagaram- Visakhapatnam ( UP ). 11. TRR ( P )- 11. 001 Tkm between Vizianagaram- Visakhapatnam ( IV th Line & SCD Line ). 12. TTR ( CS + CMSC )- 102 sets, TTR ( CMSC )- 9 sets & SEJ- 6 sets between Vizianagaram- Visakhapatnam- Duvvada of WAT Divn. 13. TRR ( P )- 1. 400 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 14. TRR ( P )- 1. 500 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 15. TRR ( P )- 1. 502 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 16. TRR ( P )- 1. 422 km on SL line in patches between SLPM- CMDP Stations on K. K. Line of WAT Divn. 17. TRR ( P )- 8. 265 Tkm between Kottavalasa- Koraput ( SL ). 18. Rebuilding and extension of Br. No. 1602 1607 and 1636A UP, Mid and Dn lines for realignment of curves between KTV- PDT for raising of speed 130 Kmph. ( All the works are over SSE/ SIG/ RGDA, SSE/ SIG/ VZM, SSE/ SIG/ MYD and SSE/ SIG/ SUP sections of Waltair Division )
Expires on 16th May, 2024
₹ 5986 Lacs