Tender Description:
Removal, Supply and Application of Thermal Insulation of&#x0d HP and IP Turbine, Control and Stop valves, Overload valves,&#x0d Cross-over pipes etc of Unit-8, 660 MW, SSCTPS, RVUN, Suratgarh
Dates:
Published on
June 20, 2024, 2:30 p.m.
Bid Opening Date
July 10, 2024, 4:30 p.m.
Doc Download started
June 20, 2024, 2:30 p.m.
Doc Download ended
July 9, 2024, 4:30 p.m.