Supply of copper plate, Supply of PVC pipe for Watering, Supply of salt, Supply of Charcoal, Supply of HDPE pipes, Supply of Copper Strips, Supply of Multi strand single core, PVC insulated copper cable, Supply and installation of Sub, Equipotential Earth Bus Bar, Supply and installation of Main, Installation Job for earth pit, including inspection chamber, Installation and Laying of, Copper strip for Earth grid, Copper strip from Earth Grid to building, Installation and, Laying of Copper strip from UPS Panel Room at Ground floor, to all the rooms in all the floors of the building and also to, the roof area of the building