Tender Description:
Item Description: supply, installation, commissioning, testing of hydraulic puller for replacement of aclathan ring/ela stic ring of wag-9 locomotives. specification as per annexure-1 enclosed. calibration certificate to be submitted along with supply. [ warranty period: 30 months after the date of delivery ] ]
Dates:
Published on
Sept. 21, 2024, 3:47 p.m.
Bid Opening Date
Sept. 30, 2024, 8:30 p.m.
Doc Download started
Sept. 21, 2024, 3:47 p.m.
Doc Download ended
Sept. 30, 2024, 8:30 p.m.