Tender Description:
Supply Dismantling Erection Testing and commissioning of existing hydraulic rail clamp assembly for ThyssenKrupp make stacker cum reclaimer of conveyor 8A installed at 4x210 Mw CHP I at SGTPS MPPGCL Birsinghpur
Dates:
Published on
Aug. 13, 2024, 4:30 p.m.
Bid Opening Date
Sept. 12, 2024, 9 p.m.
Doc Download started
Aug. 13, 2024, 5:30 p.m.
Doc Download ended
Sept. 9, 2024, 8:30 p.m.