Tender Description:
Item Description: supply and installation of 3 phase hog sequence testing kit with 60kva transformer for inspecti on oflhb ac and non-ac coaches with following specifications. 1) hog sequence testing kit shall be suitable f or inputsupply of 3 phase, 415v with neutral ,125a four poles mccb shall be provided for input supply side prote ction alongwith suitable rated supply chord (pvc) of length 5 meters. 2) hog sequence testing kit shall be havin g output supplyprovision of 3 phase, with neutral, 750v, ac with iv coupler socket. 3) uic jumper coupler shall be having 16 pinmale connector to suit conventional power car socket, the cable length shall be 3 meters. 4) ho g sequence testing kitshall be having auto over voltage shut down facility. 5) hog sequence testing kit shall be having the output capacityof 60kva for power side and 72 to 110v dc for control side. 6) hog sequence testing kit shall have in built surgeprotection. 7) hog sequence testing kit shall be having 4 pole mccb protection at 75 0v side, with current rating125a. 750v ac grade not available 690v mccb shall be used. 8) hog sequence test ing kit shall be havingindependent on/off and rest provision for each output. 9) hog sequence testing kit shall be having proper earthingprotection. 10) the power circuit and control circuit arrangement shall be loco part of dr awing entered in annexure i.11) hog sequence testing kit shall be supplied with four wheels heavy duty trolley t wo revolving and two fixed one.12) hog sequence testing kit shall be powder coated paint of aqua green colour. 13) hog sequence testing kit shallbe supplied along with user manual. 14) demonstration shall be arranged free of cost at your side. 15) hogsequence testing kit shall be suitably designed at both sides. 16) hog sequence t esting kit shall be labeled withnecessary danger/safety precaution instructions wherever necessary. [ warranty period: 30 months after the date of delivery ] ]
Dates:
Published on
Aug. 6, 2024, 12:45 a.m.
Bid Opening Date
Sept. 16, 2024, 7:30 p.m.
Doc Download started
Aug. 6, 2024, 12:45 a.m.
Doc Download ended
Sept. 16, 2024, 7:30 p.m.