Tender Description:
Sripur BOP Road - Chainage from 2.00 km to 4.0 km -Patch Repairing work and Rain damaged maintenance work (In stretches) under Uttar Dinajpur Division PWD, during the year 2024-25.
Dates:
Published on
Sept. 18, 2024, 2:30 p.m.
Bid Opening Date
Sept. 27, 2024, 5:30 p.m.
Doc Download started
Sept. 18, 2024, 4 p.m.
Doc Download ended
Sept. 25, 2024, 5 p.m.