Tender Description:
Survey design drawing supply of all materials labour T and P etc required for construction of raw water pumping station and supply laying jointing PCCP rising main and other appurtenant works with 5 years Operation and Maintenance
Dates:
Published on
March 18, 2024, 2:30 p.m.
Bid Opening Date
April 16, 2024, 8:30 p.m.
Doc Download started
March 18, 2024, 2:30 p.m.
Doc Download ended
April 8, 2024, 10:30 p.m.