Tender Description:
Planning, Design, Engineering, Construction, Fabrication, Supply,Erection, Trial Run and Commissioning of 2X6.3 MVA, 33kV/3.3kV Substation including Operation Maintenance during DLP of 60 months on Turnkey Basis at Katkona UG SECL as detailed in NIT
Dates:
Published on
June 11, 2024, 11:30 p.m.
Bid Opening Date
July 29, 2024, 4:30 p.m.
Doc Download started
June 11, 2024, 11:30 p.m.
Doc Download ended
July 26, 2024, 10:30 p.m.