Making of trenches of size 600mm x 800mm starting from, transformer to LT Panel in Power supply room by digging, the soil by removing the debris or Malba from the trenches, at AIR Kupwara, Making of trenches of size 600mm x, 800mm starting from transformer to LT Panel in Power, Supply room of building by digging CC flooring by removing, the debris or Malba from the trenches at AIR Kupwara, Providing and grouting 4inch dia GI Pipes on the Cement, concrete Flooring area at AIR Kupwara, Providing, Grouting, and fixing 4inch dia GI Pipes along the transformer, foundation wall at AIR Kupwara, Unwinding roll of 185 sq, mm 3 and half core cable from the cable drum and laying 2, length of this power cable of 70mtr through the trenches, and through the GI Pipes as laid down at AIR Kupwara, Reconstructing the CC Flooring and repairing the area with, Cement concrete and stone aggregate mixer and finishing, the surface Complete in all respect at AIR Kupwara, Providing and fixing cable route marker of cast iron 5inch, dia in 5mtr interval in whole length of cable at AIR Kupwara, Making 01mtr dia loop of cable at both end of the spare, cable and covering by soil with proper marking for future, use at AIR Kupwara, Making of trenches size 600mm x, 600mm starting from DG Sets to LT Panel and Laying one, layer of 4inch thick sand for each cable in the trenches at, AIR Kupwara, Providing and grouting of 3inch dia GI pipes, along the DG foundation the Cement concrete flooring area, Unwinding roll of 95 sq mm 3 and half core, cable from the cable drum and laying these 4 power cable, each of 40mtr through the trenches and through the GI, Pipes at AIR Kupwara, Making 01mtr dia loop of both spare, cables at both end cable and covering by soil with proper, marking for future use at AIR Kupwara, Installation and, testing 2 Nos of 125 KVA Canopy type Diesel Generator set, FM Transmitter at HPT TV site Kupwara J and K the scope, and schedule of the material mentioned attached as, Annexure A