KSR Bengaluru: SW- I: Proposed civil works for the provision of lift- 1no. at PF No. 9 and 10 for FOB at BNC end of KSR Bengaluru station. SW- II: Proposed civil works for the provision of lift- 1no. at PF No. 5 and 6 for FOB at BNC end of KSR Bengaluru station. SW- III: Provision of lift to FOB connecting Metro Sky walk on back side of KSR Bengaluru station. SW- IV: KSR Bengaluru- Mysore section: Proposed constructions of track men rest room/ tool room.- 7nos. in ADEN/ MYA section- Balance work. Maintenance period is 3months.