Procurement of set of valve assembly, design engineering manufacture procurement of materials and bought out components assembly at shop inspection testing at manufacturers works packing and delivery of the corrosion inhibitor metering dosing pumps driven by electric motor including supply of all commissioning spares mandatory spares special tools and tackles recommended spares for 2 years normal operation all as recommended by oem and documentation as per eil standard specification supervision during pre commissioning and commissioning etc as per scope of work document no b302 000 80 42 sow 9513 datasheets and other codes and standards as attached or referred all motor shall be used as per approved manufacturer only as per copy enclosed, tpi charges for above item s inclusive gst and other related items