Tender Description:
Integrated Infrastructure Project Under Silvassa Smart City Limited Phase-2. Length equal 13.418Km
Dates:
Published on
Aug. 30, 2024, 2:30 p.m.
Bid Opening Date
Sept. 21, 2024, 9 p.m.
Doc Download started
Aug. 30, 2024, 2:30 p.m.
Doc Download ended
Sept. 21, 2024, 5:30 p.m.