Gracefully removing of rack with equipments, Shifting and installation of 9U rack, Supply I and C PVC casing caping, PVC pipe 32 mm, LC to E2000 patch cord, supply I and C of 3 core power cable, Supply I and C back box and face plate, Lan cable and ABD, Flexible PVC Pipe, I and C of MCBs switch box socket, Structural Lan cabling, Two port IO, I and C accessories of PVC items, Earthing cable 1c x 4 sqmm, Intregation and commissioning of access switches with existing CUCM and warranty, Power back up for NCN rack, Plb pipe, 24F ofc Cable, GI pipe, PCC, Joint closure, OTB installation and supply, Optical milimeter, Caping and casing for IBD works, Patch cord LC LC 3 mtr length, pipe laying via open trenching with concreting, Pipe laying via clamping, OFC cable laying, Splicing inside chamber side for 3 nos OTBs Mid span jointing, OFC splicing in 3 nos OTBs, Route marker supply and installation with paint, RCC chamber supply and installation, Panel Box