Apply for loan
Login
Search
Home
Tender Search
Tender Detail
Geotechnical Investigation for Carrying out Final Location Survey for ( i ) New BG Railway Line Projects and Final Location Survey for construction of ( ii ) Doubling/ 3rd line/ 6th line of Eastern Railwa
Bihar, India
Important Dates
Bid submission started
Unknown
Bid submission ended
Aug. 4, 2024, 8:30 p.m.
Price Information
Price
Unknown
EMD
Unknown
Tender Description:
None
Tender Type:
unknown
Dates:
Published on
March 28, 2024, 8:30 p.m.
Bid Opening Date
Unknown
Doc Download started
Unknown
Doc Download ended
Unknown
Documents
Sign up to access Documents
START A FREE 7-DAY TRIAL
Department & Other Tender Information
Sign up to access Tender Information
START A FREE 7-DAY TRIAL
Similar Tenders
BIHAR
Geotechnical Investigation for Carrying out Final Location Survey for ( i ) New BG Railway Line Projects and Final Location Survey for construction of ( ii ) Doubling/ 3rd line/ 3rd & 4th line/ 4th line/
Expires on 03rd Nov, 2024
₹ Not Specified.
HARYANA
Aerial topographical Survey using DGPS based integrated drone and/ or Lidar and other field works for Final Location Survey for New BG Line/ Doubling/ 3rd line/ 4th line, 5th line, 6th line/ flyover line/ bypass line over Eastern Railway- Package- III
Expires on 22nd May, 2024
₹ 1830 Crores
HARYANA
Aerial topographical Survey using DGPS based integrated drone and/ or Lidar and other field works for Final Location Survey for New BG Line/ Doubling/ 3rd line/ 4th line, 5th line, 6th line/ flyover li
Expires on 22nd May, 2024
₹ Not Specified.
ASSAM
Final Location Survey for 3rd line between Guwahati- Lumding ( App. Length = 181. 00 km ) with Geo- Technical Investigation, preparing EIRR & submission of DPR as per Railway Board ' s latest guide lines complete in all respect.
Expires on 10th May, 2024
₹ 2895 Crores
WEST BENGAL
Final Location Survey ( FLS ) for 3rd/ 4t line on HDN Route between New Jalpaiguri- Kamakhya section ( App. Length = 421. 45 km ) with Geo- Technical Investigation, preparing EIRR & submission of DPR as per Railway Board ' s latest guide lines complete in all respect.
Expires on 10th May, 2024
₹ 6755 Crores