Fabrication supply and transportation of end clump steel of weight In air and delivery at project site Inclusive of GST, Fabrication supply and transportation of all concrete blocks as per the drawings delivery at project site Inclusive of GST, Trenching up to minus 2 C point D including onshore and offshore 80 m x 3 Inclusive of GST, WeldingofHDPEpipelineincludingsupplyofmachinemanpower materialmobilizationanddemobilizationanchoringsystemforse curingthepipelineinthelagoonandaligningHDPEpipelineasitgr owsintothelagoonforwelding, Mobilization and Demobilization of all required marine spread for all marine operations Inclusive of GST, Assembly of attachments and load out of the pipeline Inclusive of GST, Installation of the coldwater pipeline towing lowering and topend connection to onshore sump Inclusive of GST, Manpower divers seamen skilled assistants etc Inclusive of GST, Installation of warm water intake and discharge pipeline Inclusive of GST, All risk Insurance during welding and deployment of cold water pipeline Inclusive of GST