Tender Description:
Design, Engineering, Manufacture, Supply, Construction, Civil, Erection, Testing and Commissioning works for the EPC Package for Satpura TPS, Sarni (1X660 MW), on single point responsibility basis.
Dates:
Published on
Feb. 7, 2024, 10:40 p.m.
Bid Opening Date
July 3, 2024, 9:30 p.m.
Doc Download started
Feb. 7, 2024, 11:30 p.m.
Doc Download ended
April 25, 2024, 5:30 p.m.