EOI for Setting up ISTS Connected 50MW Concentrated Solar Power ( CSP ) Project with Thermal Energy Storage System ( TESS ) for 8 Hours Operation during Peak Hours and Non- Solar Hours on Build Own Operate ( B- O- O ) basis.
Greater Noida, Uttar Pradesh, India
Important Dates
Bid submission started
March 30, 2024, 3:30 p.m.
Bid submission ended
May 9, 2024, 10:30 p.m.
Price Information
Price
Unknown
EMD
0.0
Tender Description:
EOI for Setting up ISTS Connected 50MW Concentrated Solar Power (CSP)Project with Thermal Energy Storage System (TESS) for 8 Hours Operation during Peak Hours and Non-Solar Hours on Build Own Operate (B-O-O) basis.
Tender Type:
open
Dates:
Published on
March 30, 2024, 6:27 p.m.
Bid Opening Date
May 14, 2024, 10:30 p.m.
Doc Download started
March 30, 2024, 3:30 p.m.
Doc Download ended
May 9, 2024, 10:30 p.m.
Documents
Sign up to access Documents
START A FREE 7-DAY TRIAL
Department & Other Tender Information
Sign up to access Tender Information
START A FREE 7-DAY TRIAL