Electrical TRD portion of work in connection with 1 Elimination of LC no. 19 at Km 271/ 3- 4 between DD- BRB station by providing RUB of size 6. 0 x 5. 15 by pushing technique in DD- SUR section 2 Elimination of LC no. 41 at Km 390/ 1- 2 between WDS- MA station by providing RUB of size 6. 0 x 5. 15 by pushing technique in DD- SUR section 3 Provision of additional RUB at location 409/ 2- 3 by pushing method in KWV- LUR section 4 Provision of Gabion wall, Ballast retaining wall, Toe wall, Protection work etc for Bridge no. 378/ 2, 379/ 1, 383/ 2, 400/ 2, 445/ 1, 449/ 2, 465/ 1, 479/ 1, 484/ 2, 489/ 2, 504/ 1, 527/ 1, and 562/ 3, 13 no. Bridges in ADEN/ PVR section. 5 Provision of Gabion wall, Protection work etc. for Bridge. No 389/ 4, 392/ 1, 430/ 1, 446/ 1, 466/ 1, 470/ 1, 475/ 1, 482/ 2, 485/ 1, 541/ 4 & 558/ 4, 11 no. Bridges in ADEN/ LUR section of Solapur Division