Earthwork & Blanketing in embankment/ cutting in formation of BG line including yards, bridge approaches etc., Construction of bridge work ( Major/ Minor, sub structure and super structure ) as per Railway ' s approved Design and Drawing, construction of Retaining/ Boundary/ Toe wall/ Diversion Drain, Construction of station buildings, covering shed at Badiya Station, passenger amenities, Foot Over Bridge, yard drain, Supply & spreading of machine crushed stone ballast, Laying and linking of BG track for Main line, loop lines and Points & Crossing etc. in section/ yards, Transportation of P. Way materials, Welding of Rails, and other incidental miscellaneous works etc. between Patalpani station ( Excluding )- Portal 01 of Tunnel T1 ( Ch: 7440 ), circulating area, RCC Road, RCC Over Head tank and other misc. works at Badiya stations in connection with Gauge Conversion of Dr. Ambedkar nagar ( Mhow )- Sanawad section in Ratlam Division of Western Railway