Earth work for the leveling of the surface area around the, 100 metre SS steel tower and within the premises and along, the boundary wall the work shall be executed as per, document Replacement of old and damaged wooden doors, as per document Provision of LT Transformer, enclosure for security purpose. The enclosure should be, fabricated as per document Repairing of the damaged, plastering work on walls by scavenging and cleaning the, affected area in patches and providing and applying the, cement sand mixture with finish and cleaning after, completion. Supply and applying of exterior wall paint the, scope of work is as per document Supply of wooden, table for read over room ROR made up of 3inch x 3inch, wooden sal or sheshum batten for frame and legs and, 19mm HDMR board and 4mm vinear of approved shade on, the top Supply of wooden pedestal for the use as stands, for speakers at read over room ROR and Studio made up of, all around surface