Cooling solution in order to match the Bid CFD requirement, 2 X 200 KVA UPS with 10 minutes Li Ion Battery back for IT load. EOL for Li Ion will be 5 years., Cabling, Electrical isolators, electrical panels, earthing, panel extension etc., Integration of new equipment as UPS, LI Ion Batteries, Sensors, cooling equipment etc, Novec gas- based suppression system, New Gas release panel, modification in existing fire alarm system etc work., 42 U rack of 600 mm Width X 1300 mm Depth along with Rear Door Heat Exchanger, Racks for Test Bench along with rack PDU, Integration of new equipment in Airawat area as RDHX on existing BMS Platform., Any other item, material required to complete the turnkey job, Any other charges required to complete the turnkey job, Installation, commissioning, testing, allied charges