Conducting soil exploration of foundations including sample collection, testing submission of all relevant reports and conducting of survey including collection of field details alon the track/ road on either side, preparation an submission of GAd ( to the scale in original on film along with soft copy ) and preparation an submission of detailed project report at different ROB/ RUB sites in lieu of level crossings under ADEN/ AYC.