Break- down and running maintenance works for Aluminum sheet and Insulation for ducts ( All elevations of primary air ( cold and hot ), hot secondary air and flue gas ) as and when required during the period from 01. 04. 2024 to 31. 03. 2025 for Unit- 1 Boiler including T & P and consumables