Bengaluru- Mysuru section: SW- I: Strengthening of Bank by providing standard width in isolated location from 46/ 400 to 99/ 000 in UP and DOWN line. SW- II: TTR of existing 1 in 12 curved switch with TWS and weldable CMS Crossings- 8nos at Mandya and Hanakere yard. SW- III: Bengaluru- Mysuru section: Replacement of overaged SEJ with PSC improved SEJ- 52kg from km 72/ 300- 100/ 900- Total 16Nos in ADEN/ MYA section. Maintenance period is 6 months or one monsoon period whichever is later. ( Composite work )