Balance work for Construction of RCC Drain, Curtain wall, Toe wall at Bridge, Flooring, Pitching and other miscellaneous left over work in connection with 3rd line between APR- KTE under the jurisdiction of Assistant Divisional Engineer/ Umaria of Bilaspur Division.