Tender Description:
Annual rate contact for Supply, Installation, Testing and Commissioning of Design verified assembly of LT Fully Automatic Pump automation control panels
Dates:
Published on
March 20, 2024, 5:20 p.m.
Bid Opening Date
June 12, 2024, 4:30 p.m.
Doc Download started
March 20, 2024, 5:20 p.m.
Doc Download ended
May 9, 2024, 10:30 p.m.