Twin Control Wiring, 2 Module, 4 Module, 6 Module, 12 Module, 5 or 6 A switch, 2 way 5 or 6 A switch, 15 or 16 A switch, 3 pin 5 or 6 A socket outlet, 6 pin 15 or 16 A socket outlet, Brass baten Angle Holder, Supply and fixing Modular Blanking Plate, Installation of LED Bulkhead, Installation and Testing of Tube Lights, 20 mm PVC Conduit, 3x 1. 5 sq mm copper wire, 3 x 4 sq mm copper wire, Supply of Copper Armoured Cable, Supply of Copper Unarmoured Cable, Laying of UG Cable up to 35 sqmm, MCB DB 6 way, Double door, MCB DB 4 way 4 plus 12, MCB Single pole 20 A, MCB Double Pole 32 A, Supplying and fixing of Double Pole 40 A MCB, Supplying and fixing of Double Pole 63 A MCB, Supply of LED Tube Light, Supply of LED Bulkhead, Supply of PVC Cable Tray, Supply and installation of wall mounted Fan, Labour charge of cable tray fitting work, Supply of Copper Strip for Earthing work, Supply of earth road, Supply of 1 core 25 Sqmm Copper wire, Supply of ESE Lightning Protection System, Fabrication work, Labour Charges for 02 Nos Earthing Borewell, Labour Charges for fitting of Copper strip, Labour Charges, Supply of Battery Charger