1. ED- CBE SECTION: Proposed Construction of pedestrian subway, including collection well and Roof covering of size 3. 00x 2. 75 m in lieu of existing Level crossing No: 6 Km: 6/ 15- 17 between Irugur- Peelamedu Stations., 2. Irugur- Coimbatore Section: Proposed Construction of Limited User Subway of size 4. 50 x 2. 75m in lieu of existing Level crossing No: 7 at Km: 8/ 1- 3 between Irugur- Peelamedu Stations., 3. IGU- PLMD SECTION Proposed Construction of pedestrian subway, including collection well and Roof covering of size 3. 00x 2. 75 m in lieu of existing Level crossing No: 9 Km: 10/ 19- 20 between Peelamedu- Coimbatore North Stations., 4. Proposed Construction of Stair, Collection well and Roof covering at existing level crossing No. 10 at Km. 11/ 33- 35 between Peelamedu- Coimbatore North Stations., 5ED- IGU Section: Launching of already pre casted RCC Box of size 3. 00x2. 75m for pedestrian subway, with stair, collection well and Roof covering in lieu of existing Level crossing No: 132 at Km: 440/ 26- 28 between Uthukuli and Tiruppur Stations., 6ED- IGU Section: Launching of already pre casted RCC Box of size 3. 00x2. 75m for pedestrian subway, collection well with pump house and Roof covering in lieu of existing Level crossing No: 133 Km: 441/ 9- 11 between Uthukuli and Tiruppur Stations.