Complete floor mating supply and laying including labour as, given in Sl No 1 of specification document., Diffincial, system complete overhauling with the following spare parts, as required as given in Sl No 2 of specification documents, Complete FIP pump overhauling by authorized dealer with, changing of the following spare parts as given in Sl No 3 of, specification document, Supply, fitting and fixing of the, following items as given in Sl No 4 of secification document, Engine oil and all filter replacing with new parts as given in, Sl No 5 of specification document, Electric line checking and, repairing with the items as given in Sl No 6 of specification, document, Dismantling of Suspension system opening and, overhauling after taking out the unserviceable spare parts, as given in Sl No 7 of specification document, Computerised Wheel alignment as given in Sl No 8 of, Front and rear brake system, checking and repairing as given in Sl No 9 of specification, Complete self starter damaged one taken out, from the veh body and refitting with new self assembly as given, in Sl No 10 of specification document, Gear sifting rod, taking out checking and refitting the same after changing of, the following item as given in Sl No 11 of specification