Apply for loan
Login
Search
Home
Tender Search
Tender Detail
Laying of cable in pipe, Laying of cable on surface, digging of soil, 40mm Dia B Class GI pipe, 40mm medium class PVC pipe, end termination, 63 Amps 4 Pole change over, straight through joint, servicing of 1. 5TR SAC units, 24W 4ft LED fitting
Bangalore, Karnataka, India
Important Dates
Bid submission started
June 24, 2024, 11:30 p.m.
Bid submission ended
July 5, 2024, 4:30 p.m.
Price Information
Price
Unknown
EMD
Unknown
Tender Description:
None
Tender Type:
open
Dates:
Published on
June 24, 2024, 11:30 p.m.
Bid Opening Date
July 5, 2024, 5 p.m.
Doc Download started
Unknown
Doc Download ended
Unknown
Documents
Sign up to access Documents
START A FREE 7-DAY TRIAL
Department & Other Tender Information
Sign up to access Tender Information
START A FREE 7-DAY TRIAL
Similar Tenders
WEST BENGAL
DG SET, AMF PANEL, ITC, CABLE, Bus Bar Chamber, CIVIL WORK, CABLE LAYING 1, CABLE LAYING 2, End termination 1, Straight through joint, GI Earthing, GI strip
Expires on 19th Jul, 2024
₹ Not Specified.
BIHAR
Attending break down, Transportation charges, servicing, of AB Switch, Replacement Operating Handle, Replacement operating pipe, Replacement of pin insulators, Replacement of disc insulators, Replacement Lightening, arrestors, Replacement of AB switch, Supplying laying, weasel conductor, Replacement HT cable, Bunch Cable, Laying power cable Direct in ground, Laying, power cable in RCC pipe, Laying power cable in air, Replacement outdoor cable end termination, Replacement, straight through cable joint, Rewiring DP structure of, Transformer, Replacement of faulty cables, Laying of, power cable direct in ground, Laying of power cable in, existing RCC pipe, Laying power cable on wall surface, Replacement MV cable end terminations, Replacement of, 16 or 35 sqmm Al socket, Replacement faulty 63A TPN, Switch Fuse Unit, Replace 63Amp 4- pole on load change, over, Dismantling faulty transformer, Dismantling the 40, or 63 KVA transformer, Rewinding of 16 or 25 KVA LT Coil, Rewinding of 16 or 25 KVA HT Coil, Rewinding of 40 or 63, KVA LT Coil, Rewinding of 40 or 63 KVA HT Coil, Rewinding, of 40 or 63 KVA LT, Rewinding of 40 or 63 KVA HT, Supplying and pouring transformer oil, Replacement HV, Bushings of transformer, Replacement LV Bushings of, transformer, To and fro Transportation charges, Supplying, RCC or PCC pole, Erection of RCC or PCC or PSC pole, Supplying and erection stay, Supplying and fixing GI pipe
Expires on 09th Jul, 2024
₹ 2962 Lacs
JHARKHAND
Attending break down, Transportation charges, servicing, of AB Switch, Replacement Operating Handle, Replacement operating pipe, Replacement of pin insulators, Replacement of disc insulators, Replacement Lightening, arrestors, Replacement of AB switch, Supplying laying, weasel conductor, Replacement HT cable, Bunch Cable, Laying power cable Direct in ground, Laying, power cable in RCC pipe, Laying power cable in air, Replacement outdoor cable end termination, Replacement, straight through cable joint, Rewiring DP structure of, Transformer, Replacement of faulty cables, Laying of, power cable direct in ground, Laying of power cable in, existing RCC pipe, Laying power cable on wall surface, Replacement MV cable end terminations, Replacement of, 16 or 35 sqmm Al socket, Replacement faulty 63A TPN, Switch Fuse Unit, Replace 63Amp 4- pole on load change, over, Dismantling faulty transformer, Dismantling the 40, or 63 KVA transformer, Rewinding of 16 or 25 KVA LT Coil, Rewinding of 16 or 25 KVA HT Coil, Rewinding of 40 or 63, KVA LT Coil, Rewinding of 40 or 63 KVA HT Coil, Rewinding, of 40 or 63 KVA LT, Rewinding of 40 or 63 KVA HT, Supplying and pouring transformer oil, Replacement HV, Bushings of transformer, Replacement LV Bushings of, transformer, To and fro Transportation charges, Supplying, RCC or PCC pole, Erection of RCC or PCC or PSC pole, Supplying and erection stay, Supplying and fixing GI pipe
Expires on 08th Jul, 2024
₹ 1995 Lacs
BIHAR
Attending break down, Transportation charges, servicing, of AB Switch, Replacement Operating Handle, Replacement operating pipe, Replacement of pin insulators, Replacement of disc insulators, Replacement Lightening, arrestors, Replacement of AB switch, Supplying laying, weasel conductor, Replacement HT cable, Bunch Cable, Laying power cable Direct in ground, Laying, power cable in RCC pipe, Laying power cable in air, Replacement outdoor cable end termination, Replacement, straight through cable joint, Rewiring DP structure of, Transformer, Replacement of faulty cables, Laying of, power cable direct in ground, Laying of power cable in, existing RCC pipe, Laying power cable on wall surface, Replacement MV cable end terminations, Replacement of, 16 or 35 sqmm Al socket, Replacement faulty 63A TPN, Switch Fuse Unit, Replace 63Amp 4- pole on load change, over, Dismantling faulty transformer, Dismantling the 40, or 63 KVA transformer, Rewinding of 16 or 25 KVA LT Coil, Rewinding of 16 or 25 KVA HT Coil, Rewinding of 40 or 63, KVA LT Coil, Rewinding of 40 or 63 KVA HT Coil, Rewinding, of 40 or 63 KVA LT, Rewinding of 40 or 63 KVA HT, Supplying and pouring transformer oil, Replacement HV, Bushings of transformer, Replacement LV Bushings of, transformer, To and fro Transportation charges, Supplying, RCC or PCC pole, Erection of RCC or PCC or PSC pole, Supplying and erection stay, Supplying and fixing GI pipe
Expires on 08th Jul, 2024
₹ 2547 Lacs
CHHATTISGARH
Supply of Split AC, ITC of SAC, Copper Pipe, Copper Cable, Outdoor stand, PVC drain pipe, Dismantling of SAC
Expires on 15th Jul, 2024
₹ 3015 Lacs