11 Nos AHU outlet air flow control flap valve mechanism to be repaired, Flag staff supporting shoe at foxle deteriorated to be replaced, Barometer holding locker at bridge wing is to be fabricated and fitted, Ships tender box damaged and brokento be fabricated as per sample, Deck washing machine cover to be fabricated and fitted, ELSA holding locker box set is to be fabricated as per sample