SW- I ) SLU: Raising of PF No. 1 from ML to HL for 540 metres and raising of PF No. 2 & 3 from RL to HL for 540 meters with water pedestals and seating arrangements and 60 sqm low cost PF shelter at PF No. 2 & 3. SW- II ) MYK: Extension and raising of PF No. 1 and PF No. 2 to 557. 5 meters High level, 4 nos. of stiainless steel drinking water pedestal and 6 nos. of granite benches at MYK