Balance works of Investigation, Survey, Planning, Design, Construction and handing over of 2064 EWS DUs/ Flats ( Each of super builtup area of 300 Sft ) in ( G plus 3 ) pattern with Monolithic Concrete Construction ( Shearwall Technology ) and with suitable foundations as per soil conditions including internal infrastructure facilities such as water supply, sanitary and electrification under PMAY ( HFA ) with 2 years Defect Liability Period under EPC system at Machilipatnam, Gudivada ULBs in Krishna District.